Category: NCRTC Updates

08

Jul2020
NCRTC has geared up construction activities on India’s first Regional Rail between Delhi-Ghaziabad-Meerut. M/s Larsen & Tubro today kickstarted the foundation work in Modinagar and Shatabdi Nagar in Meerut under package 3 works. With this main construction work for ... Read More
July 8, 2020admin

06

Jul2020
NCRTC has completed the shifting and modification work of UPPTCL Electrical High Tension Line, i.e. 400KV, single circuit, near Ordnance Factory, Muradnagar (Ghaziabad). The shifting and modification work of this EHT line was carried out using special types of monopoles. These ... Read More
July 6, 2020admin

21

Jun2020
NCRTC employees practiced Yoga on the International Yoga Day 2020
June 21, 2020admin

15

Jun2020
NCRTC has completed shifting and modification work of 4th major and important EHT line of POWER GRID i.e. 400KV, Single Circuit (Dadri – Panipat II), near S.R.M. University Muradnagar (Ghaziabad). With this, a total of 23 EHT lines infringing ... Read More
June 15, 2020admin

29

May2020
NCRTC has completed the shifting and modification work of 400kV, double circuit, Power Grid EHT Line near Asalat Nagar, before Prachin Mandir Muradnagar. This was the third EHT line of Power Grid which has been shifted. With this, a total of ... Read More
May 29, 2020admin

19

May2020
NCRTC has invited global bids for the signaling and telecom systems of the Delhi-Ghaziabad-Meerut RRTS Corridor. Modern ETCS Level-II signaling will be a system that will be used for the first time in India to be integrated with LTE backbone based ... Read More
May 19, 2020admin

06

May2020
The National Capital Regional Transport Corporation (NCRTC), the nodal agency executing first RRTS project of the country has recently finalized procurement of rolling stock of Delhi-Ghaziabad-Meerut RRTS corridor, in which Bombardier Transportation India Private Limited emerged the winner. Against the ... Read More
May 6, 2020admin

04

May2020
The shifting and modification work of 20th Electrical High Tension line of 132 kV, Double Circuit of North Central Railway from Dadri to Sahibabad near Sahibabad RRTS Station has been completed successfully. There were a total six EHT lines infringing ... Read More
May 4, 2020admin

15

Apr2020
In the wake of the novel coronavirus outbreak, NCRTC has taken many initiatives to contain it at its workplaces and work sites. workers were made aware of the problem and provided food and stay with the adequate distribution of soaps, masks ... Read More
April 15, 2020admin

14

Apr2020
In a first of its kind effort by NCRTC, digitally-enabled global pre-bid meetings via video conferencing for two critical packages were conducted on 14th April 2020. This received excellent response from the industry, other than Indian entities, prospective bidders from across ... Read More
April 14, 2020admin