Revision of standard specifications of Electrical & Electromechanical systems of Metro rail

MENU

MD inspects construction works in the Priority Section

NCRTC Managing Director Shri Vinay Kumar Singh inspected the progress of construction works in the Priority Section of RRTS Corridor. The inspection was focused on the construction work of all the 5 stations, viaducts, and installation of various systems for the 17-km long Priority Section, between Sahibabad to Duhai, of the Delhi-Ghaziabad-Meerut corridor.

Agreement with DB India for O&M

NCRTC has taken a pathbreaking step by entering into a first-of-its-kind agreement with DB India for the comprehensive Operation and Maintenance of the 82 km long Delhi-Ghaziabad-Meerut RRTS corridor for a period of 12 years. Speaking on the occasion,

First trainset of India’s 1st RRTS reaches Duhai Depot

The first trainset of India’s first RRTS has reached Duhai Depot. This trainset was loaded on a trailer from the manufacturing plant located in Savli, Gujarat, and brought to Duhai via road. In its journey to reach Duhai Depot, the train has travelled through three states; Rajasthan, Haryana, and finally Uttar Pradesh. All the six […]

Vice President AIIB visits RRTS Corridor

Shri Urjit R. Patel, Vice President, Asian Infrastructure Investment Bank (AIIB), along with Shri Vinay Kumar Singh, Managing Director, NCRTC, visited some of the important sites, in the Delhi section, of the Delhi-Ghaziabad-Meerut RRTS corridor. AIIB is one of the multilateral funding agencies for the country’s first RRTS corridor. Team NCRTC gave him an overview […]