civil construction work on the Package-I (From Vaishali to Ghaziabad via Sahibabad)
![](https://ncrtc.in/wp-content/uploads/2023/12/121-1024x682.jpeg)
NCRTC started civil construction work on the Package-I (From Vaishali to Ghaziabad via Sahibabad) of the priority section of the Delhi-Ghaziabad-Meerut RRTS corridor. The civil construction work on the Package-II (Ghaziabad station to EPE) of the priority section is already in advanced stages. The 17-km long priority section is from Sahibabad to Duhai, which is […]