M/s SNM Construction 86, Jagriti Appt., Rani Bagh, Sainik Vihar, Pritampura Delhi-110034
Site Development Work of Ghaziabad RRTS Station including Block Work & Plastering at EE Pocket-C of Sahibabad RRTS Station for commissioning of priority section of Delhi Ghaziabad Corridor. Meerut RRTS
M/s D'lush Interior Solution A-302, Kalkaji New Delhi-110019
New Acoustic louver panels in classrooms & BIM Lab and new carpet tiles in floor area of BIM lab in basement of Admin Building at RRTS Duhai Depot, Ghaziabad
Voestalpine Railway Systems GmbH - Voestalpine VAE VKN India Pvt. Ltd. (Consortium) 24/5, Sri Ram Road, Civil Lines, Delhi-110 054
Design, Manufacture and Supply of Standard Gauge 60 Kg UIC Turnouts and Scissors Cross overs for Delhi Ghaziabad -Meerut Regional Rapid Transit System (RRTS) Corridor
Third-party Inspection of Ballasted and Ballastless track fittings at Manufacturer - Plant for Delhi- Ghaziabad-Meerut RRTS Corridor of NCRTC commissioning of Ballastless/Ballasted track for RRTS from Sarai Kale Khan (in Delhi) to Modipuram (in UP) including Jangpura Stabling yard, Duhai and Modipuram Depot for Delhi- Ghaziabad-Meerut RRTS Package 17
MD Construction Co., 554 G.F. Upper, Gali No.14, Zakir Nagar, New Delhi-25
Site Development work of Entry- exit of pocket - C of Sahibabad RRTS Station including complete drainage arrangement for commissioning of Priority Section of Delhi- Ghaziabad-Meerut RRTS Corridor.
Cement Concrete Block work and Plastering work at Entry-Exit Pocket-A & B of Sahibabad RRTS Station for commissioning of Priority section of Delhi - Ghaziabad - Meerut RRTS Corridor
M/s Arvindera Electricals 311, Sector 44-A, Chandigarh-160047
Shifting/modification of 33/11/0.4 KV, transformer of PVVNL infringing in Delhi Ghaziabad -Meerut RRTS corridor of NCRTC from Muradnagar-Modinagar at ch. no. 40200-54000.
M/s Vaishnavi Engineers & Contractors F-436, Sector-63 Noida
Interior works ,tiles work, false ceiling, LED light, fitting & fixture etc in female washroom at first floor near vikas meeting room, Gati Shakti Bhawan, INA, New Delhi
M/s Vaishnavi Engineers & Contractors F-436, Sector-63 Noida
Interior work, Tile work, False Ceiling, LED Light, Fitting and fixture etc., in washroom near first floor IT room at GatiShakti Bhawan, INA, New Delhi.
M/s AFCONS Infrastructure Limited & Registered Office Afcons House, 16 Shah Industrial Estate, Azad Nagar, Veera Desai Road, Andheri (west), Mumbai 400 053
Design and Construction of Tunnels by TBM from near Brahampuri DN Ramp to Begumpul UP Ramp and 3 Under Ground Station at Meerut Central, Bhaisali & Begumpul by Cut & Cover Method including Architectural Finishing and Design, supply, installation, testing and commissioning of Electrical and Mechanical Systems including Fire detection & suppression Systems and Hydraulic systems on Delhi- Ghaziabad Meerut RRTS Corridor
M/s AFCONS Infrastructure Limited & Registered Office Afcons House, 16 Shah Industrial Estate, Azad Nagar, Veera Desai Road, Andheri (west), Mumbai 400 053
Construction of elevated viaduct from Sarai Kale Khan station to New Ashok Nagar DN Ramp including Jangpura Entry ramp and two Nos. of elevated stations viz, Sarai Kale Khan & New Ashok Nagar [including Pre-engineered steel roof structure but excluding Architectural Finishing of Stations] of Delhi - Meerut Regional Rapid Transit System (RRTS) Corridor.
M/s Shanghai Tunnel Engineering Co. Ltd. No. 1099, Wanping South Road, Xuhui District, Shnanghai, China
Design and Construction of Tunnels by TBM from near New Ashok Nagar DN Ramp to Sahibabad UP Ramp and One Under Ground Station at Anand Vihar by Cut & Cover Method (including Architectural Finishing und Design, supply, installation, testing and commissioning of Electrical and Mechanical Systems including Fire detection & suppression Systems and Hydraulic systems on Delhi-Ghaziabad- Meerut RRTS Corridor of NCRTC
M/s SD Enterprises Ground Floor, D-717, Street No. 19, Bhajan pura, North East Delhi-110053
Removal of Earth, Building Rubbish, Unserviceable materials, Malba etc from edge of Delhi-Meerut road and balance work of Rain Water Harvesting at Ghaziabad approach and Minor Miscellaneous work from End of Ghaziabad station to Guldhar Station of Priority section under CPM/Ghaziabad for Delhi-Ghaziabad-Meerut RRTS Corridor
M/s D'lush Interior Solution A-302, Kalkaji, New Delhi-110019
Interior work tile work, false ceiling, LED light, fitting & fixture etc in washroom at Ground Floor near Pragati meeting room and 2nd floor Toilets, Gati Shakti Bhawan.
M/s Excellent Structures Pvt. Ltd, A-31, Lane No. 1, Abul Fazal Enclave, Okhla, South Delhi, Delhi- 110025
Construction of Precast Boundary Wall for NCRTC Land at Duhai and other miscellaneous works for commissioning of Duhai Depot of Delhi-Ghaziabad Meerut RRTS Corridor
M/s K. P. Associates, G-80, Sector-63, Noida, Uttar- Pradesh-201301, Tel. 9871250463
Execution of enabling civil works such as reconstruction of sm structure, road repairing, drain repairing & construction, small utility diversion, misc, electrical works and other associated works pertaining to Sarai Kale Khan (SKK)-SNB (Shahjahanpur- Neemrana-Behror) Regional Rapid Transit System (RRTS) Corridor
Detailed Geotechnical - Investigation work from Sarai Kale Khan (SKK) (Ch. 9 km) to IDPL Complex (Ch. 23.30 km) of SKK (Sarai Kale Khan) - SNB (Shahjahnpur- Neemrana - Behror) Regional Rapid Transit System (RRTS) Corrior
Construction of elevated viaduct from the start of the elevated ramp near Sahibabad RRTS Station up to the end of Ghaziabad RRTS Station, including all special spans and two nos. of elevated RRTS Stations viz., Sahibabad and Ghaziabad [excluding Architectural Finishing & Roof structure of Stations] of Delhi Meerut Regional Rapid Transit System (RRTS) Corridor.
Balance Development and road work for various Misc. items for Guldhar & Duhai RRTS Stations in Priority section under CPM/Ghaziabad for Delhi-Ghaziabad-Meerut RRTS Corridor Delhi-Ghaziabad-Meerut RRTS Corridor
Balance Development work for various Misc. items at Guldhar RRTS Station in Priority section under CPM/Ghaziabad for Delhi-Ghaziabad-Meerut RRTS Corridor
Manufacture, Supply, transportation and delivery of 2000 MT of UIC 60/60E-1/60 KG 1080 Grade Head Hardened Rails Class-A confirming to IRS T-12-2009 (latest amendment) for Depot and Depot Connecting line of Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) Corridor in India
Construction of elevated viaduct from end of Ghaziabad RRTS Station up to EPE crossing (including), elevated viaduct & Ramp for connection to Duhai Depot, including all special spans and two Nos. of Elevated RRTS stations viz. Guldhar and Duhai [excluding Architectural Finishing & Roof structure of Stations] of Delhi - Meerut Regional Rapid Transit System Corridor
Detailed geotechnical investigation work for underground section in between chainage 32.80 KM(Rajiv Chowk) to Chainage 10.80 KM(Kherki Dhaula Toll) etc
Construction of elevated viaduct from end of Ghaziabad RRTS station upto EPE crossing including elevated viaduct and ramp for connection to Duhai depot
Consultancy Services for carrying out the Feasibility Study for connecting Delhi Alwar RRTS from SNB Urban Complex to Sotanala RIICO Industrial Area followed by preparation of Detailed Project Report. (Length: 37 Km).
Construction of elevated viaduct from start of elevated ramp near Sahibabad RRTS Station upto end of Ghaziabad RRTS Station, including all special spans and two nos. of elevated RRTS Stations viz., Sahibabad and Ghaziabad [excluding Architectural Finishing & Roof structure of Stations] of Delhi – Meerut Regional Rapid Transit System (RRTS) Corridor.