The pre-construction activities are underway on the Delhi-Gurugram-SNB corridor. A tender for the engagement of Detailed Design Consultant for Civil, Architectural, E&M Works for the design of three elevated stations (Udyog Vihar, Sector-17 and Rajiv Chowk) and elevated viaduct between IDPL Complex Ramp (Gurugram) to Rajiv Chowk Ramp has been floated.
Visit of senior delegation of AIIB and DEA
A high-level delegation comprising the Board of Directors of Asian Infrastructure Investment Bank (AIIB) visited the first RRTS corridor, connecting