In a major development NCRTC has appointed a consortium of M/s Egis Rail- M/s INECO and M/s Egis India as Interim Detailed Design Consultant for first section of Delhi-Ghaziabad-Meerut corridor of RRTS. The construction will be taken up after the consultant finalizes detailed design of elevated viaduct and general parameters such as maximum moving dimensions, track centers etc.
Shri Munna Kumar joins NCRTC as Director (Works)
Shri Munna Kumar, a 1992 batch Indian Railways Service of Engineers (IRSE) officer, has joined NCRTC as Director (Works). Mr.