NCRTC has completed shifting and modification work of 4th major and important EHT line of POWER GRID i.e. 400KV, Single Circuit (Dadri – Panipat II), near S.R.M. University Muradnagar (Ghaziabad). With this, a total of 23 EHT lines infringing Delhi-Ghaziabad-Meerut RRTS Corridor have been shifted. The shifting and modification work was carried out by following Standard Operating Procedure (SOP) in view of the COVID-19 outbreak which includes the thermal screening of officials and labourers, the use of sanitizers and maintaining social distance.
![](https://ncrtc.in/wp-content/uploads/2023/03/48.jpg)
![](https://ncrtc.in/wp-content/uploads/2023/03/49.jpg)
![](https://ncrtc.in/wp-content/uploads/2023/03/50.jpg)