NCRTC has completed the shifting and modification work of 400kV, double circuit, Power Grid EHT Line near Asalat Nagar, before Prachin Mandir Muradnagar. This was the third EHT line of Power Grid which has been shifted. With this, a total of 21 EHT lines infringing the Delhi-Ghaziabad-Meerut RRTS Corridor have been shifted/modified.
PHDCCI Global Rail Convention
Shri Shalabh Goel, MD, NCRTC, shared his views on the ‘Future of mobility in India’ and the transformative impact of