Revision of standard specifications of Electrical & Electromechanical systems of Metro rail

MENU

Tender No.

Name of work

Mode of Tender Enquiry

Date of Publication of NIT

Date format : (dd/mm/yyyy)

Type of Bidding (Single/Two Bid System)

Date of Letter of Award(LOA)

Date format : (dd/mm/yyyy)

Work awarded to

Package 11: Architectural Finishing for 11 Elevated Stations (viz. Sarai Kale Khan, New Ashok Nagar, Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South Stations, Brahmpuri, MES Colony, Daurli, Meerut North, Modipuram) and Design Verification, Detailed Engineering, Supply, Installation, Testing and Commissioning of Electrical and Mechanical Systems including Fire Detection & Suppression Systems and Hydraulics Systems from Sarai Kale Khan to New Ashok Nagar DN Ramp and Duhai (EPE) to start of Partapur Station and Begumpul UP Ramp to Modipuram of Delhi � Ghaziabad � Meerut RRTS Corridor. IN TWO LOTS (ii)DM/AC/COR-OF/128 Lot-P11 L2: Package-11: Architectural Finishing for 9 Elevated Stations (viz. Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South Stations, Brahmpuri, MES Colony, Daurli, Meerut North, Modipuram) and Design Verification, Detailed Engineering, Supply, Installation, Testing and Commissioning of Electrical and Mechanical Systems including Fire Detection & Supression Systems and Hydraulics Systems from Duhai (EPE) to start of Partapur Station and Begumpul UP Ramp to Modipuram of Delhi Ghaziabad Meerut RRTS Corridor

Open E-bid

18/10/2020

Single Stage Two Packet System

15/04/2021

M/s URC Construction (P) Ltd

Package 11: Architectural Finishing for 11 Elevated Stations (viz. Sarai Kale Khan, New Ashok Nagar, Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South Stations,

Open E-Bid

18/10/2020

Single Stage Two Packet System

15/04/2021

M/s Metcon-CP JV

DA/UD/COR-OF/024 - Shifting/Modification work of 66KV/132KV EHV lines of HVPNL infringing Delhi Gurugram - SNB RRTS Corridor

Open E-Bid

16/01/2021

Single Stage Two Packet System

15/06/2021

M/s AQUARIAN ENTERPRISES

Consultancy services for establishment of Project Monitoring & Strategic Support Unit (PMSSU) for implementation of Regional Rapid Transit System in National Capital Region

Open E-Bid

23/10/2019

Single Stage Two Packet System

15/10/2020

The Boston Consulting Group (India) Private Limite

Package 4: Design and Construction of Tunnels by TBM from near New Ashok Nagar DN Ramp to Sahibabad UP Ramp and One Under Ground Station at Anand Vihar by Cut & Cover Method [Including Architectural Finishing and Design, supply, installation, testing and commissioning of Electrical and Mechanical Systems including Fire detection & suppression Systems and Hydraulic systems] on Delhi – Ghaziabad – Meerut RRTS Corridor of NCRTC.

Open E-Bid

09/11/2019

Single Stage Two Packet System

09/12/2020

M/s Shanghai Tunnel Engineering Co. Ltd.

Package 7: Construction of elevated viaduct from end of Shatabdi Nagar Station to Brahmpuri DN Ramp and from Begumpul UP Ramp to Modipuram end including Modipuram Depot entry Ramp and 5 elevated stations viz., Brahmpuri, MES Colony, Darauli, Meerut North & Modipuram [Excluding Architectural Finishing & Pre-engineered steel roof structure of Stations] of Delhi-Ghaziabad- Meerut Regional Rapid Transit System (RRTS) Corridor.

Open E-Bid

10/04/2020

Single Stage Two Packet System

Package 12A: Design, Fabrication, Supply and Erection of Pre-Engineered Steel Roof Structure of 04 (Four) Elevated stations viz Sahibabad, Ghaziabad, Guldhar and Duhai Stations of Delhi-Ghaziabad-Meerut RRTS Corridor

Open E-Bid

26/02/2020

Single Stage Two Packet System

29/10/2020

M/s Sam (India) Builtwell Pvt. Ltd.

Construction of elevated viaduct from Sarai Kale Khan station to New Ashok Nagar DN Ramp including Jangpura Entry ramp and two Nos. of elevated stations viz., Sarai Kale Khan & New Ashok Nagar [including Pre-engineered steel roof structure but excluding Architectural Finishing of Stations] of Delhi- Meerut Regional Rapid Transit System (RRTS) Corridor.

Open E-Bid

20/02/2020

Single Stage Two Packet System

15/10/2020

M/s Afcons Infrastructure Limited

Construction of Depot cum Workshop near Duhai RRTS Station [including Architectural Finishing, PEB, E&M and Road works] of Delhi Ghaziabad Meerut RRTS Corridor.

Open E-Bid

08/01/2020

Single Stage Two Packet System

04/11/2020

M/s VNC-KEC (JV)

Package-9A: Construction of Multistoried Staff Quarters [including Site Development, Architectural finishes, E&M, HVAC, Plumbing, Firefighting, External Development and related facilities] and connectivity from Mathura Road to Jangpura Stabling Yard Complex for Delhi Ghaziabad Meerut RRTS Corridor.

Open E-Bid

29/04/2020

Single Stage Two Packet System

09/10/2020

M/s SAM (India) Builtwell Pvt Ltd