Design, Supply, Installation, Testing and Commissioning of Signalling &Train Control, Platform Screen Doors and Telecommunication Systems for Delhi Ghaziabad Meerut RRTS Corridor of NCRTC
Open E-Bid
17/04/2020
Single Stage Two Packet System
10/12/2020
Consortium of M/s Alstom Transport India Limited and M/s Alstom Ferroviaria SPA
Lot-P19 L2: Design, Supply, Installation, Testing and Commissioning of Receiving Sub Stations [including 25 kV AC Traction cum 33 KV Auxiliary Main Sub Stations], Extra High Voltage & High Voltage cabling, 25 KV Overhead Equipment (FOCS/ROCS), Auxiliary Power Supply [including Auxiliary Sub Stations] and Associated works on Viaduct & Tunnel from Duhai (EPE) to Modipuram [including Modipuram Depot] for Delhi Ghaziabad Meerut RRTS Corridor of NCRTC
Lot-P19L1:- Design, Supply, Installation, Testing and Commissioning of Receiving Sub Stations [including 25 kV AC Traction cum 33 kV Auxiliary Main Sub Stations], Extra High Voltage & High Voltage Cabling, 25 KV Overhead Equipment (FOCS/ROCS), Auxiliary Power Supply [including Auxiliary Sub Stations], Operation Control Centre and Associated Works on Viaduct & Tunnel from Sarai Kale Khan to Duhai (EPE) [including Jangpura Stabling Yard and Duhai Depot] and SCADA System for Complete Corridor of Delhi Ghaziabad Meerut RRTS Corridor of NCRTC
Package 8: Design and Construction of Tunnels by TBM from near Brahampuri DN Ramp to Begumpul UP Ramp and 3 Under Ground Station at Meerut Central, Bhaisali & Begumpul by Cut & Cover Method Including Architectural Finishing and Design, supply, installation, testing and commissioning of Electrical and Mechanical Systems including Fire detection & suppression Systems and Hydraulic systems on Delhi Ghaziabad Meerut RRTS Corridor
Manufacturing, Supply, Installation, Testing & Commissioning of Ballast-less/ Ballasted Track from Sarai Kale Khan (in Delhi) to Modi Puram (in UP) including Jangpura Stabling Yard, Duhai and Modipuram Depots for Delhi-Ghaziabad-Meerut RRTS Corridor of NCRTC
Shifting/modification work of supply, laying, jointing, Testing and Commissioning of 220KV D/C, 1x1200 & 1x1000 Sq.mm underground cable of Delhi Transco Limited between Maharani Bagh and Indraprastha Park at Sarai Kale Khan infringing Delhi-Ghaziabad-Meerut RRTS Corridor of NCRTC (Chainage 0 to 2000).
Engagement of Resettlement Implementation Support Agency (RISA) for the implementation of Resettlement Plan (RP) for Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) Corridor in National Capital Region
Special Limited Bid
Single Stage Two Packet System
26/08/2020
M/s. Centre for Market research and Social develop
Engagement of a Consultant for the provision of External Monitor Consultancy services for the implementation of Environmental Management System for Delhi-Ghaziabad-Meerut Regional Rapid Transit System (RRTS) Corridor in National Capital Region
Execution of enabling civil works and works related to utilities shifting such as water pipeline, storm water drain, sewer line, gas pipelines, road widening works, etc. and associated electrical & telecom work between IDPL Complex and SNB of Delhi-SNB RRTS Corridor