Revision of standard specifications of Electrical & Electromechanical systems of Metro rail

MENU

4th Tunnel Breakthrough in Meerut

The Delhi-Ghaziabad-Meerut RRTS corridor witnessed its fourth successful tunnel breakthrough in Meerut. Sudarshan 8.3 (tunnel boring machine) successfully completed the construction of about 750 meters long tunnel between Gandhibagh and Begumpul station and made a breakthrough on the tunnel retrieving shaft constructed at Begumpul station.