The Delhi-Ghaziabad-Meerut RRTS corridor witnessed its fourth successful tunnel breakthrough in Meerut. Sudarshan 8.3 (tunnel boring machine) successfully completed the construction of about 750 meters long tunnel between Gandhibagh and Begumpul station and made a breakthrough on the tunnel retrieving shaft constructed at Begumpul station.
Urban Mobility Conference & Expo 2024
With an exhibition stall designed taking inspiration from the shape of Namo Bharat trains, NCRTC presented the transformative features of