Meerut’s longest tunnel on the Delhi-Ghaziabad-Meerut RRTS corridor had a successful breakthrough. Sudarshan 8.1, the tunnel boring machine, constructing this tunnel, successfully completed the construction of an about 2 km long tunnel between Bhainsali to Meerut Central Station and made a breakthrough through the tunnel retrieving shaft built at Meerut Central Station.
![](https://ncrtc.in/wp-content/uploads/2022/12/1-1.jpg)
![](https://ncrtc.in/wp-content/uploads/2022/12/3-1.jpg)
![](https://ncrtc.in/wp-content/uploads/2022/12/5-1.jpg)
![](https://ncrtc.in/wp-content/uploads/2022/12/2-1.jpg)
![](https://ncrtc.in/wp-content/uploads/2022/12/4-1.jpg)
![](https://ncrtc.in/wp-content/uploads/2022/12/6-1.jpg)